Remodeling | Faze Construction Blog
Learn the best practices for shower installation in Fort Wayne, Indiana. Discover proper waterproofing, drainage, tile installation, ventilation, materials, warranties, and the installation standards...
Call (260) 226-8800When most homeowners think about a shower remodel, they focus on the finished product.
They think about:

But the most important part of a shower remodel is usually the part homeowners never see.
It's the waterproofing system underneath.
At Faze Construction, we believe the long-term success of a shower installation depends on what happens behind the walls and beneath the tile, not just how beautiful the final shower looks.
Let's walk through the best practices for installing a shower in Fort Wayne, Indiana.
Every quality shower remodel starts with proper demolition.
This means removing:
A full demolition gives you access to the structure underneath.
This is critical because it allows the installer to inspect everything before rebuilding.
Skipping proper demolition can allow hidden problems to remain buried inside the wall system.
Once demolition is complete, the next step is evaluating the structure.
This includes checking:
The goal is to ensure there is a solid, stable, level foundation for the new shower system.
Common problems we find include:
Any structural issues should be corrected before moving forward.
A premium shower system starts with a strong foundation.
Before waterproofing begins, all plumbing systems should be inspected.
The goal is to identify any:
This step is critical.
You do not want hidden plumbing issues underneath a brand-new shower system.
All plumbing should be roughed in and confirmed to be functioning properly before installation continues.
This is the most important step in the entire shower installation.
The waterproofing system is what protects your home from long-term water damage.
At Faze Construction, we use professional waterproofing systems designed to create a complete moisture barrier.
This may include systems such as:
These materials create a sealed waterproof environment behind the finished shower surface.
Every seam, corner, and transition point must be properly sealed.
This step requires precision.
The shower pan is the base waterproofing system of the shower.
Its job is simple:
Direct water safely toward the drain.
The pan must be built with the proper slope to ensure water flows correctly.
Improper slope can cause:
Once the pan is complete, best practice is to perform a flood test.
This is one of the most important quality control steps.
The shower pan is filled with water and left to sit for 24 hours.
A water level line is marked before testing begins.
After 24 hours, the water level is checked.
If the water level drops:
The pan is failing and must be repaired.
If the water level remains consistent:
The waterproofing system is functioning properly.
This test verifies the shower system is sealed before moving forward.
Skipping this step increases the risk of hidden leaks.
Once waterproofing is complete and the flood test passes, installation of the finished shower begins.
The final system may include:
This is the visible part of the remodel.
Depending on the selected shower system, installation may include:
At this stage, aesthetics and function come together.
The final installation stage includes all finishing details.
This may include:
This is where the shower truly comes to life.
Attention to detail matters heavily here.
Before the project is complete, every component should be tested.
This includes:
Everything should be inspected to ensure the shower performs exactly as intended.
This is something homeowners need to understand.
Most shower systems do not fail because:
Most shower failures happen because the waterproofing system underneath was compromised.
When waterproofing fails, water damage can remain hidden for years.
Sometimes even decades.
That hidden damage can eventually lead to:
This is why proper installation matters so much.
A beautiful shower means very little if the system underneath fails.
The best shower installations focus on three major things:
The finished aesthetic matters.
But the prep and waterproofing matter just as much, if not more.
At Faze Construction, we build shower systems designed for long-term durability, beauty, and performance.
Our bathroom remodeling process focuses on:
If you're considering a shower remodel in Fort Wayne, Indiana, our team can help.
Contact Faze Construction today to schedule your bathroom remodeling consultation and learn how to build a shower system that lasts.
Related service: Bathrooms in Fort Wayne | See your price range on the Pricing page
Most failures come from water getting behind the tile: poor waterproofing, a bad pan, or failed grout. The finished tile hides the problem until the damage is already done.
The shower pan is filled with water and left for 24 hours to prove it holds before tile goes on. If the level drops, there is a leak to fix first.
The foundation, framing, plumbing, drain, and waterproofing all need to pass inspection before the finished shower system goes in.
4.9 stars from 257 Google reviews. Here is what Fort Wayne homeowners said in their own words.
“Faze inspected my roof and found storm/hail damage and was able to work with my insurance company to get new roof installation. Faze worked for my benefit and provided excellent service. Faze went the extra mile every step of the process and ensured that I was informed and answered any questions that I had along the way. I would recommend them to my closest friends and family!”
Richard Short
“Faze Roofing and Construction came out and gave us an inspection and quote the same day. They were out the next week right before Thanksgiving and had the roof completed within a day. Super happy with the professionalism and work that was done. Their pricing was super competitive! We look forward to using them for our Christmas lights this winter and in the future!”
Maegen Barbour
Tell us about your home and your project. The form takes about two minutes, and a Faze team member follows up to confirm your inspection time.

Your inspector takes photos of what they find, walks you through them, and leaves you with a written quote. You decide what happens next.
★ 4.9, 257 Google reviews
See your price range in about a minute, then book a free inspection and get your exact written quote.